Cinder

Split Stream

Raw capture looks complete. Priority products are missing.

Further priority products gap if the stage after raw capture stays broken.

DEMONSTRATION SCENARIO

This is a demonstration scenario. It is not a live demonstration and does not report an executed result.

The situation

A contact’s raw capture is complete and stored. Product generation is a later stage.

Some priority products are missing. Raw capture for the same contact looks complete.

Why this is hard

The first break can be after raw retention. Collecting the contact again, or restarting an instrument that already produced the raw, does not repair a later product stage.

A new contact or an instrument restart should not count when raw capture is already complete.

What the operator can see

What changes, without naming the hidden cause
  1. RawCapture complete
  2. ProductPriority gaps
  3. At riskFurther products

What V8Y must determine

V8Y must distinguish a product gap after raw capture from incomplete raw, a silent instrument, and a failed contact. Re-collecting is not automatically the repair.

What may happen next

Further priority products gap until that stage is repaired.

What counts as recovery

Not recovery

Success is not another contact.

Recovery

Success is that product completeness matches the raw capture.

Observed results

No executed results are published for this thread.

What this evaluation would test

  • Raw complete, product not.
  • Do not re-collect.
  • Not a silent instrument.
  • Any specific filter in the demo is synthetic.

These are the conditions the evaluation would test. They are not reported results.

Operational basis

View operational basis and sources

Derived from NASA’s lesson on ADEOS-II: Level-0 SeaWinds gaps at ground stations even though raw capture for those contacts was complete. Any routing rule here is synthetic. The lesson did not publish one.

NASA. LLIS-1355, ADEOS-II Level-0 gaps. 2003.

Discuss evaluating this situation

Does your environment face a similar problem?

The request keeps this mission and thread. It is not a claim that the demonstration has been validated in your environment.

The printable flyer is being revised and is not available for download.

Cinder · Demo catalog

Government acquisition